The Langat 2 Project is for water treatment and distribution facilities which to transfer raw water from Pahang to Selangor. The visit is meant to see closely the construction of Langat 2 rock tunnel project. The 527m inlet portal (tunnel) is constructed to supply treated water to western corridor of Klang valley. The progress of granite rock tunnel is currently excavated at 220m by drill-and-blast method. The tunnel is a modified horse shoe tunnel with height and span of 5.27m and 7.54m.
Organizer: PAAB (Pengurusan Aset Air Berhad)
Date: 29 June 2019
Venue: Hulu langat, Selangor